Part of the protocol route, the 370m long Jambatan Seri Perdana is built across the lake of Putrajaya. The design is Islamic with 8 rest areas for visitors to enjoy the breathtaking scenery of the surrounding lake area that includes the Prime Minister's Office and Masjid Putra.
Bridge Structure
The bridge is made up of 7 central spans of 75m and 2 end spans of 55m. There are two separate carriageways over a two twin cell box girder. In the cross section, the overall width between extreme ends of two box girder is 23m. The foot path is flanked by railing and the roads median is lined by decorative street-lighting.